Capillary rise test


A sample of concrete is placed with one surface just in contact with water and the height or weight of water absorbed by capillary rise is measured.

3 June 2025


Measuring gas permeability


Gas permeability tests measure the flow of a gas into the concrete under the action of a pressure gradient.

3 June 2025


Burnishing of concrete


This appears as random dark glossy areas on power trowelled surfaces.

3 June 2025


Negative aggregate transparency


Negative aggregate transparency can occur in formed concrete when there is segregation of fines and associated water between the form-face and the coarse aggregate.

3 June 2025


Aggregate transparency


Aggregate transparency can occur in formed concrete when there is segregation of fines and associated water between the form-face and the coarse aggregate.

3 June 2025


Lift lines


Lift lines (sometimes referred to as pour lines) appear as colour changes along the boundaries between successive lifts within a pour.

3 June 2025


Poker burn


Dark coloured marks on the concrete surface. Caused by the insertion vibrating poker brusing the formwork (typically timber) face leaving a scar that is then transferred to the concrete cast surface.

3 June 2025


K Slump


The K Slump test is covered by ASTM C 1362.

3 June 2025


Quartering of aggregate


Quartering is the alternative method of reducing the size of a bulk aggregate sample where a sample divider (riffle box) is not available. The bulk sample should be shovelled to form a cone, and turned over to form a new cone, this being done three times. The third cone shoul d be flattened to an even layer 75 - 100 mm thick and then divided into four equal quadrants with two diagonally opposite quarters being discarded. The procedure is then repeated on the remainder until the desired size of sample remains. A similar process can be used for sub-dividing fresh concrete.

3 June 2025


Page 2 of 112
Featured Fingertips

Hot weather concreteing. Higher temperatures for the fresh concrete will lead to more rapid hydration and higher early age maximum temperatures.

Delamination is characterised by thin layers of surface mortar becoming detached from the main body of the slab. Concrete Advice Sheet 18 provides an overview of the causes of delamination in concrete floors.

Delamination in concrete

Cold joints are formed primarily between two batches of concrete where the delivery and placement of the second batch has been delayed and the initial placed and compacted concrete has started to set. The full knitting together of the two batches of concrete under vibration to form a homogeneous mass is therefore not possible, unlike the compaction of two fresh workable batches of concrete. This could be a potential plane of weakness.

Cold joint in wall between batches

Prior to the introduction of power tools, a floated finish was that produced by a large, generally wooden or sometimes metal, hand float moved over the surface when the concrete was still plastic. This produced a flattish slightly textured surface which often contained float marks. Nowadays, the operation is carried out using powered machines fitted with either a large circular pan or large flat metal floats. Power floating is generally carried out later than hand floating as the concrete needs to take the weight of the machine. A simple test is when the heal of a boot leaves only a slight impression, say 3mm. Power-floating produces a similar surface to hand floating, with a slightly textured surface often with circular swirl marks from the floating operation. This operation is sometimes called panning.

Floated and trowelled finishes
Our top 10 most visited Fingertips
Featured Fingertips

Hot weather concreteing. Higher temperatures for the fresh concrete will lead to more rapid hydration and higher early age maximum temperatures.

Delamination is characterised by thin layers of surface mortar becoming detached from the main body of the slab. Concrete Advice Sheet 18 provides an overview of the causes of delamination in concrete floors.

Delamination in concrete

Cold joints are formed primarily between two batches of concrete where the delivery and placement of the second batch has been delayed and the initial placed and compacted concrete has started to set. The full knitting together of the two batches of concrete under vibration to form a homogeneous mass is therefore not possible, unlike the compaction of two fresh workable batches of concrete. This could be a potential plane of weakness.

Cold joint in wall between batches

Prior to the introduction of power tools, a floated finish was that produced by a large, generally wooden or sometimes metal, hand float moved over the surface when the concrete was still plastic. This produced a flattish slightly textured surface which often contained float marks. Nowadays, the operation is carried out using powered machines fitted with either a large circular pan or large flat metal floats. Power floating is generally carried out later than hand floating as the concrete needs to take the weight of the machine. A simple test is when the heal of a boot leaves only a slight impression, say 3mm. Power-floating produces a similar surface to hand floating, with a slightly textured surface often with circular swirl marks from the floating operation. This operation is sometimes called panning.

Floated and trowelled finishes

Latest Fingertips

Calcined Clay discussion document

This discussion document aims to demonstrate the viability of calcined clays as a Supplementary Cementitious Material (SCM) in concrete. The paper recommends a series of interventions to enable behavioural change, demand signalling, and widespread adoption of calcined clay in the UK.

There are many concrete surface finish specifications that can be specified, for example

AdobeStock_588155603_800

Hot weather concreteing. Higher temperatures for the fresh concrete will lead to more rapid hydration and higher early age maximum temperatures.

3

In nearly all instances, cracks develop at the surface of concrete and are restrained by the tensile reinforcement. If a good bond exists between the concrete and the steel, the width of the crack at the steel will be very small.

void

The formation of openings in concrete, either to reduce the weight of the structure or to provide access for services, calls for particular attention in the selection of the former material, positioning and subsequent withdrawal if required.

ivor

For the direct measurement of the permeability of concrete by the flow method, a test cell is required that is similar, in principle, to the modified triaxial cells used in standard soil and rock mechanics tests.

penetration

For dense and, hence, low permeability concrete, the depth of penetration method is usually a more practical proposition than permeability flow tests.

rmt

There are indications that this test is less variable than the Rapid Chloride Permeability testing RCPT and unaffected by different cementitious materials and conductive admixtures.

This method is described in AASHTO T 277–831 ‘Rapid Determination of the Chloride Permeability of Concrete’ and ASTM C1202.

Featured Fingertips

Hot weather concreteing. Higher temperatures for the fresh concrete will lead to more rapid hydration and higher early age maximum temperatures.

Delamination is characterised by thin layers of surface mortar becoming detached from the main body of the slab. Concrete Advice Sheet 18 provides an overview of the causes of delamination in concrete floors.

Delamination in concrete

Cold joints are formed primarily between two batches of concrete where the delivery and placement of the second batch has been delayed and the initial placed and compacted concrete has started to set. The full knitting together of the two batches of concrete under vibration to form a homogeneous mass is therefore not possible, unlike the compaction of two fresh workable batches of concrete. This could be a potential plane of weakness.

Cold joint in wall between batches

Prior to the introduction of power tools, a floated finish was that produced by a large, generally wooden or sometimes metal, hand float moved over the surface when the concrete was still plastic. This produced a flattish slightly textured surface which often contained float marks. Nowadays, the operation is carried out using powered machines fitted with either a large circular pan or large flat metal floats. Power floating is generally carried out later than hand floating as the concrete needs to take the weight of the machine. A simple test is when the heal of a boot leaves only a slight impression, say 3mm. Power-floating produces a similar surface to hand floating, with a slightly textured surface often with circular swirl marks from the floating operation. This operation is sometimes called panning.

Floated and trowelled finishes

Featured Fingertips

Hot weather concreteing. Higher temperatures for the fresh concrete will lead to more rapid hydration and higher early age maximum temperatures.

Delamination is characterised by thin layers of surface mortar becoming detached from the main body of the slab. Concrete Advice Sheet 18 provides an overview of the causes of delamination in concrete floors.

Delamination in concrete

Cold joints are formed primarily between two batches of concrete where the delivery and placement of the second batch has been delayed and the initial placed and compacted concrete has started to set. The full knitting together of the two batches of concrete under vibration to form a homogeneous mass is therefore not possible, unlike the compaction of two fresh workable batches of concrete. This could be a potential plane of weakness.

Cold joint in wall between batches

Prior to the introduction of power tools, a floated finish was that produced by a large, generally wooden or sometimes metal, hand float moved over the surface when the concrete was still plastic. This produced a flattish slightly textured surface which often contained float marks. Nowadays, the operation is carried out using powered machines fitted with either a large circular pan or large flat metal floats. Power floating is generally carried out later than hand floating as the concrete needs to take the weight of the machine. A simple test is when the heal of a boot leaves only a slight impression, say 3mm. Power-floating produces a similar surface to hand floating, with a slightly textured surface often with circular swirl marks from the floating operation. This operation is sometimes called panning.

Floated and trowelled finishes

Consistence, measured using the slump test (BS EN 12350-2), is either specified as a class or target. Although a supplier will endeavour to provide the required value or range, deviations in production and sampling apply. The following tables give the maximum allowable deviation based on a spot sample taken from the initial discharge of a ready-mixed concrete truck.

Concrete consistence slump test apparatus

Carbonation is the reaction of carbon dioxide in the environment with the calcium hydroxide in the cement paste. This reaction produces calcium carbonate and lowers the pH to around 9.

Carbonation of concrete

The slump test is a means of assessing the consistency of fresh concrete. It is used, indirectly, as a means of checking that the correct amount of water has been added to the mix. The test is carried out in accordance with BS EN 12350-2, Testing fresh concrete. Slump test.&nbsp

concrete slump test

The following Table gives the compressive strengths (based on cylinders and cubes), modulus of elasticity and tensile strength for various strength classes of normal weight concrete. They are taken from Table 3.1 of the Eurocode 2, which gives additional properties as well as values for other strength classes. It should be notes that these are characteristic values and should be modified as appropriate for design purposes.

Honeycombing is the term used to describe areas of the surface that are coarse and stony. It may be caused by insufficient fine material in the mix, perhaps due to incorrect aggregate grading or poor mixing. This can be corrected by increasing the sand and cement content of the mix and by proper mixing, placing and compaction. Alternatively, honeycombing may be caused by leakage of grout or mortar fraction from the concrete at construction or formwork joints. The obvious solution here is to ensure that joints are well sealed and leak-free.

honeycombing concrete