Filler joist' as an early form of floor slab construction, which was commonly used between about the 1880s and 1920s. A number of patented systems were developed at the end of the 1800s. It was formed from iron or steel joists spaced up to about 1 m apart and in-filled with unreinforced concrete. Loads applied to the concrete were transferred to the joists, with the concrete acting as a shallow arch. The soffit of the slab was flat, unlike the type of construction using 'jack arches'.

Fingertips

Easily access helpful, in-depth information on all things concrete construction—right at your fingertips.

Filler joist slabs

Filler joist’ as an early form of floor slab construction, which was commonly used between about the 1880s and 1920s. A number of patented systems were developed at the end of the 1800s. It was formed from iron or steel joists spaced up to about 1 m apart and in-filled with unreinforced concrete. Loads applied to the concrete were transferred to the joists, with the concrete acting as a shallow arch. The soffit of the slab was flat, unlike the type of construction using ‘jack arches’.

The Concrete Society
This website uses cookies to improve your web experience.