Skip links

Bridge cantilever construction – cable stayed

Bridge cantilever construction – cable stayed

Cable-stayed bridges can be built as a cantilever construction. Here, the stays are placed and stressed as soon as a segment is either cast in-situ or transported to position. The connection of the new segment to the previous part of the deck is either by post-tensioned or un-stressed reinforcement.

Fingertips

Easily access helpful, in-depth information on all things concrete construction—right at your fingertips.

Bridge cantilever construction – cable stayed

Cable-stayed bridges can be built as a cantilever construction. Here, the stays are placed and stressed as soon as a segment is either cast in-situ or transported to position. The connection of the new segment to the previous part of the deck is either by post-tensioned or un-stressed reinforcement.


The Concrete Society
Cable-stayed vs balanced canitlever construction
Pont Sucharskiego
This website uses cookies to improve your web experience.