Externally bonded FRP – Inspection
FRP strengthening systems for concrete structures must be correctly specified for the anticipated loadings and environment. In addition appropriately trained staff must be used to install the materials. It is important that all stages of the process are monitored and that the strengthened structure is inspected regularly when in service.



