Enhancing the capacity of concrete bridges
The increasing demands placed on the UK bridge stock during the last decade, including the introduction of 40 tonne vehicles and a robust motorway widening programme, caused a major re-evaluation of bridge strengthening. As a result, the bridge industry came up with many innovative methods to enable appropriate strengthening processes to be carried out economically and to provide long-term integrity.




