Trial panels as bench marks

An essential part of the preconstruction programme of any contract involving visual concrete should be the building of a large sample or full-size mock-up of a section of the structure. Ideally, the sample should be built on site by the contractor. It may be used to verify the construction methods, the suitability of the reinforcement detailing, the formwork, the concrete, and any awkward junctions or features which could possibly give rise to problems. It should include a horizontal and a vertical construction joint. The construction sample will be a test of the designer’s foresight as well as of the contractor’s ability. It is therefore important for both parties to appreciate the need for full cooperation well in advance. As the main purpose of the sample is to ‘uncover any unexpected difficulties’ which may arise in construction, it should be built as early as possible in order to allow for revisions. The sample must be specified and included in the bill of quantities.

jonnyhough

jonnyhough

Blemishes in power trowelled slabs

Power trowelled concrete floors occasionally exhibit surface blemishes believed to be caused by the proximity to the surface of coarse aggregate particles.

Aggregate transparency
Aggregate transparency is seen as mottled patches of colour on the surface. These correspond to the position of coarse aggre&#173

jonnyhough

jonnyhough

Maintenance of external paving

Correctly designed and constructed external concrete pavements should have a long service life and require only limited maintenance. However some changes in the condition of the pavement over time and some maintenance, especially at joints, are to be expected. Therefore, it is strongly recommended that routine monitoring be undertaken at intervals to assess the condition of the pavement and to also assess the rate of change.

jonnyhough

jonnyhough

Construction methods for external paving

Traditional construction methods for external paving can lead to slower rates of progress and as a result the construction of the paving may be on the ‘critical path’ of the construction programme. There is thus a need to significantly improve the construction productivity of external concrete paving, by developing simple uncomplicated and ‘buildable’ designs and by carefully rethinking the construction process.

jonnyhough

jonnyhough

Voided suspended floors

Voided suspended slabs can be constructed by incorporating hollow plastic spheres between the upper and lower reinforcement layers. The effect of the spheres is to displace concrete from areas in the span in which it has no structural benefit

jonnyhough

jonnyhough

Steel/concrete suspended floors

As an alternative to concrete precast units (see Structural elements/Suspended floors/Composite suspended floors), profiled steel decking may be used as permanent formwork with in-situ concrete (often lightweight aggregate concrete) to form a composite floor slab. This construction method is mainly used in steel frame, high rise buildings, though can be used with any type of frame. The profiled steel provides all the tensile reinforcement for the completed slab

jonnyhough

jonnyhough

Curling of ground-supported floor slabs

Curling of ground-supported floor slabs has been, and continues to be a problem. It is likely to occur in most floors but is usually insignificant. Its magnitude, however, is unpredictable.