|
CONCRETE Feature list
|
|
|
|
NOVEMBER 2010 (Editorial deadline: 6 September 2010)
|
|
•
|
The Concrete Society Awards 2010
|
|
|
|
DECEMBER 2010 (Editorial deadline: 5 October 2010)
|
|
•
|
Ready-mixed Concrete
|
|
•
|
Visual Concrete
|
|
•
|
Formwork and Falsework
|
|
•
|
Admixtures
|
|
•
|
Repair and Strengthening
|
|
January 2011 (Editorial deadline: 8 November 2010)
|
|
•
|
Bridge Construction and REpair
|
|
•
|
Concrete Architecture and Design
|
|
•
|
Concrete On-Site
|
|
•
|
CEI Section
- Tunnels and Tunneling
- Concrete in the Ground
|
|
February 2011 (Editorial deadline: 13 December 2010)
|
|
•
|
Marine Constructio
|
|
•
|
Concrete Repairing and Strengthening
|
|
•
|
Formwork and Falsework
|
|
•
|
Roads and Railways
|
|
•
|
CEI Section
- Decorative Concrete
- Precast Concrete
|
|
March 2011 (Editorial deadline: 10 January 2011)
|
|
•
|
Concrete Frame Construction
|
|
•
|
Construction Chemicals
|
|
•
|
Sustainable Construction
|
|
•
|
Batching Plant, Pumping and Concrete Equipment
|
|
•
|
CEI Section
- Repair and Strengthening
- Concrete and Water
|
|
April 2011 (Editorial deadline: 03 February 2011)
|
|
•
|
High-Rise Construction
|
|
•
|
Precast Concrete
|
|
•
|
Concrete REinforcement
|
|
•
|
Stadiums and Arenas
|
|
•
|
CEI Section
- Concrete and Infrastructure
- Concrete Bridges
|
|
May 2011 (Editorial deadline: 04 March 2011)
|
|
•
|
Tunnels and Tunnelling
|
|
•
|
Concrete in the Ground
|
|
•
|
In-Situ/Ready-mixed Concrete
|
|
•
|
Visual/Decorative Concrete
|
|
•
|
CEI Section
- High-rise Construction
- In-situ Concrete
|
|
June 2011 (Editorial deadline: 06 April 2011)
|
|
•
|
CementitiousMaterials/Aggregates
|
|
•
|
Training and Education
|
|
•
|
Car Parks
|
|
•
|
Post-tensioning and Prestressing
|
|
•
|
CEI Section
- Concrete Architecture/Design
- Concrete Reinforcement
|
|
July 2011 (Editorial deadline: 05 May 2011)
|
|
•
|
Concrete and Infrastucture
|
|
•
|
Research and Development
|
|
•
|
External Paving/Hardstandings
|
|
•
|
Concrete Sawing and Drilling
|
|
•
|
CEI Section
- Stadiums and Arenas
- Floors and Screeds
|
|
August 2011 (Editorial deadline: 06 June 2011)
|
|
•
|
formwork and Falsework
|
|
•
|
Concrete Durability/Aggressive Environments
|
|
•
|
Concrete Repair and Strengthening
|
|
•
|
CEI Section
- Roads and Railways
- Sprayed Concrete
|
|
September 2011 (Editorial deadline: 06 July 2011)
|
|
•
|
Floors and Screeds
|
|
•
|
Fibres
|
|
•
|
Roads and Railways
|
|
•
|
CEI Section
- Formwork and Falsework
- Sprayed Concrete
|
|
October 2011 (Editorial deadline: 05 August 2011)
|
|
•
|
Schools, Hospitals, Prisons and Public Buildings
|
|
•
|
Special Concretes
|
|
•
|
Concrete in Civil Engineering Projects
|
|
•
|
Glass-fibre-reinforced Concrete
|
|
•
|
CEI Section
- Precast Concrete
- Post-tensioning/Prestressing
|
|
November 2011 (Editorial deadline: 12 September 2011)
|
|
•
|
The Concrete Society Awards 2011
|
|
December 2011 (Editorial deadline: 05 October2011)
|
|
•
|
In-situ/Ready-mixed Concrete
|
|
•
|
Visual/Decorative Concrete
|
|
•
|
Formwork and Falsework
|
|
•
|
CEI Section
- Construction Chemicals
- Marine Construction
|
|
|
|
|